# Fieldwire T&M tags as draft change orders: A signed Time and Material tag in Fieldwire becomes a draft change order, with the labor, equipment and materials listed.

Retyping signed Time and Material tags from Fieldwire into change orders? Get a draft change order per tag, with hours and materials listed.

[Build this in ChatGPT](https://hypamoon.com/connect?chat=chatgpt&via=connect-to-chatgpt~fieldwire/tm-tags-as-change-orders&say=a%20draft%20Fieldwire%20change%20order%20for%20each%20submitted%20T%26M%20tag%2C%20with%20labor%2C%20equipment%20and%20materials%20from%20the%20tag%2C%20created%20after%20I%20approve%2C%20and%20a%20Friday%20list%20of%20tags%20not%20yet%20on%20one.) [Build this in Claude](https://hypamoon.com/connect?chat=claude&via=connect-to-claude~fieldwire/tm-tags-as-change-orders&say=a%20draft%20Fieldwire%20change%20order%20for%20each%20submitted%20T%26M%20tag%2C%20with%20labor%2C%20equipment%20and%20materials%20from%20the%20tag%2C%20created%20after%20I%20approve%2C%20and%20a%20Friday%20list%20of%20tags%20not%20yet%20on%20one.)

No account needed to try. See what you will ask your chat

Example

A draft Fieldwire change order for each submitted T&M tag, with labor, equipment and materials from the tag, created after I approve, and a Friday list of tags not yet on one.

Change order proposal

T&M tag 0412, Riverside block B

Labor: 2 electricians, 6 hours each. Equipment: scissor lift, 1 day. Materials: 40 m cable tray, 12 brackets. Tag signed on site on 18 Nov. Create as draft change order CO 017?

Example data

-   When a Time and Material tag is submitted in Fieldwire, you get a proposal for a draft change order on that project: the tag number, the date, labor hours per trade, equipment and materials as on the tag, with the tag PDF attached.
-   After your approval the change order is created in Fieldwire, and you add the prices there.
-   A weekly list shows submitted tags that are not on a change order yet.

From your Fieldwire account You approve first

## Paste this in your chat

Your chat builds it and runs it every time, on your own Fieldwire data. No account needed to try.

The sentence

> With Hypamoon, when a Time and Material tag is submitted in Fieldwire, propose a draft change order on that project with the tag number, date, labor hours per trade, equipment and materials from the tag, and the tag PDF. After my approval create it in Fieldwire. Every Friday email me the submitted tags that are not on a change order yet.

[Build this in ChatGPT](https://hypamoon.com/connect?chat=chatgpt&via=connect-to-chatgpt~fieldwire/tm-tags-as-change-orders&say=a%20draft%20Fieldwire%20change%20order%20for%20each%20submitted%20T%26M%20tag%2C%20with%20labor%2C%20equipment%20and%20materials%20from%20the%20tag%2C%20created%20after%20I%20approve%2C%20and%20a%20Friday%20list%20of%20tags%20not%20yet%20on%20one.) [Build this in Claude](https://hypamoon.com/connect?chat=claude&via=connect-to-claude~fieldwire/tm-tags-as-change-orders&say=a%20draft%20Fieldwire%20change%20order%20for%20each%20submitted%20T%26M%20tag%2C%20with%20labor%2C%20equipment%20and%20materials%20from%20the%20tag%2C%20created%20after%20I%20approve%2C%20and%20a%20Friday%20list%20of%20tags%20not%20yet%20on%20one.)

Hypamoon not in your chat yet? The button adds it first, without an account, and then opens your chat with this sentence.

## How it goes today

1.  Filter the Forms tab on submitted Time and Material tags.
2.  Open each tag and copy the labor hours, equipment and materials.
3.  Create a change order and type the tag contents into the description.
4.  Link the tag to the change order and keep track of which tags are billed.

## How it can go

When a Time and Material tag is submitted in Fieldwire, you get a proposal for a draft change order on that project: the tag number, the date, labor hours per trade, equipment and materials as on the tag, with the tag PDF attached. After your approval the change order is created in Fieldwire, and you add the prices there. A weekly list shows submitted tags that are not on a change order yet.

## What you need

**What Fieldwire shares**\
Foremen fill in Time and Material Tag forms in Fieldwire with labor, equipment and materials, and get them signed on site. To bill that work, someone in the office reads each tag and types it into a change order or an invoice.

**Access**\
Fieldwire first switches on access for your company when you ask them, which can take a few business days. After that you get the key, or create it yourself, and paste it in the portal, never in the chat.

**Your key**\
Fieldwire first enables API access for your account, as part of an Enterprise contract or as an add-on to a Pro, Business or Business Plus plan through their sales team. After that an account owner or manager generates the API token under API Settings on the Account tab. It stays yours.

## More for teams on Fieldwire

-   [**I want the hours from our Fieldwire timesheets in one payroll file, without opening every form and retyping the numbers.**](https://hypamoon.com/connect-to/fieldwire/timesheet-hours-for-payroll)
-   [**I want the week of daily reports turned into one client update, without rewriting it from five forms every Friday.**](https://hypamoon.com/connect-to/fieldwire/weekly-client-report)
-   [**I want one list of late RFIs per company every week, with the reminder already written, so the answers come back before they hold up work.**](https://hypamoon.com/connect-to/fieldwire/overdue-rfis-per-company)
-   [**I want the submittals that put an on site date at risk at the top of a list each week, without a separate spreadsheet.**](https://hypamoon.com/connect-to/fieldwire/submittal-lead-time-check)
-   [**I want the cost codes heading over budget on one list each week, across projects, without opening every budget.**](https://hypamoon.com/connect-to/fieldwire/budget-alerts-per-cost-code)
-   [**I want to copy a set of tasks to a new project with their checklists and text, without the CSV round trip and fixing red cells.**](https://hypamoon.com/connect-to/fieldwire/copy-tasks-to-another-project)
-   [**I want to send a safety notice or a holiday schedule to everyone on our Fieldwire account at once, without a dummy project.**](https://hypamoon.com/connect-to/fieldwire/email-every-user-on-the-account)
-   [**I want new and completed tasks for my trades to show up in our team channel, where we already talk about the job.**](https://hypamoon.com/connect-to/fieldwire/task-updates-in-teams)
-   [**I want clients to report punch items on a simple form, so they land in Fieldwire without someone retyping every email.**](https://hypamoon.com/connect-to/fieldwire/punch-list-form-for-clients)
-   [**I want the owner to check progress whenever they like on a simple page, without adding them to our Fieldwire project.**](https://hypamoon.com/connect-to/fieldwire/client-progress-page)
-   [**I want subcontractors without Fieldwire to update their own punch items, without me typing their emails into each task.**](https://hypamoon.com/connect-to/fieldwire/subcontractor-update-link)
-   [**I want to see each month who has not used Fieldwire for a while, so we stop paying for people who left.**](https://hypamoon.com/connect-to/fieldwire/inactive-users-license-check)
-   [**I want one task sheet across projects with our custom fields and the floor and room path, without stitching exports together.**](https://hypamoon.com/connect-to/fieldwire/export-tasks-with-custom-attributes)
-   [**I want to know the next morning when a site skipped its daily report, so it gets filled in while people still remember the day.**](https://hypamoon.com/connect-to/fieldwire/daily-report-check)
-   [**I want every failed check on our inspection forms to become a task for the right trade, without creating them one by one.**](https://hypamoon.com/connect-to/fieldwire/inspection-findings-to-tasks)
-   [**I want one closeout document for the whole project, with one table of contents, not a zip of parts that each start at page 1.**](https://hypamoon.com/connect-to/fieldwire/closeout-report-as-one-pdf)
-   [**I want the completed tasks that nobody verified yet in one list, so they get checked while the trade is still on site.**](https://hypamoon.com/connect-to/fieldwire/completed-tasks-waiting-for-verification)
-   [**Everything for Fieldwire**](https://hypamoon.com/connect-to/fieldwire)